It takes up minimal space in the utility room and contains the necessary components.
Our installations can be found in many buildings across the Czechia and in other countries of Europe.
OUR COMPANY
Information on quality and environmental policy through the sale of quality products.
CAREER
What career can await you with us and what positions are currently available in our company?
Information line
Mon-Fri: 7:00 am-3:00 pm
Our friendly team is available for all of your suggestions and questions.
Service line
Mon-Fri: 7:00 am-5:00 pm
Weekends: 8:00 am-12:00 pm
Do you need service or a service inspection?
Design support
Mon-Fri: 7:00 am-3:00 pm
Planning, design, installation and commissioning. Quality support with our specialists.
It takes up minimal space in the utility room and contains the necessary components.
Our installations can be found in many buildings across the Czechia and in other countries of Europe.
OUR COMPANY
Information on quality and environmental policy through the sale of quality products.
CAREER
What career can await you with us and what positions are currently available in our company?
Information line
Mon-Fri: 7:00 am-3:00 pm
Our friendly team is available for all of your suggestions and questions.
Service line
Mon-Fri: 7:00 am-5:00 pm
Weekends: 8:00 am-12:00 pm
Do you need service or a service inspection?
Design support
Mon-Fri: 7:00 am-3:00 pm
Planning, design, installation and commissioning. Quality support with our specialists.
In the village of Šardice, a new residential building for the elderly was built, which contains nine one-room residential units and one common room. All apartments are designed for barrier-free use. The building is situated on a vacant plot of land in an inhabited part of the village of Šardice in a gap at the edge of a terraced housing estate, which was created by the removal of the family house. The building is intended for social rental housing for the elderly.
![]() | invertor DYNAMIC 16 kW HP3AWX 16 |
System | AIR-WATER |
Accessories | accumulation vessel SG 300 B electric boiler 18 kW |
Usage | heating and hot water |
Place of realization | 696 13 Šardice |
Year of installation | 2020 |
Thermal loss | 540 m² |
Heating system | low temperature - combined |
Hot water heating | 500 l TeV / day |
Are you interested in this realization?
If you are interested in any of our products or services, please do not hesitate to contact us.